Greenway Bridges
Miami, FL


Installation of Auger Cast Piles
  • Compression Load Test
  • Tension Load Test
  • Lateral Load Test

Bridge A – Black Creek Trail

  • # of Piles: 4 piles
  • Diameter: 24″
  • Length: 20′
  • Grout Strength: 5,000 PSI
  • Additional Services: Not Applicable

Bridge B – Biscayne Trail

  • # of Piles: 4 piles
  • Diameter: 24″
  • Length: 20′
  • Grout Strength: 5,000 PSI
  • Additional Services: Not Applicable

Images

20140820_084614 Greenway Bridges, Bridge A-Black Creek Trail and Bridge B-Biscayne Trail_01 Greenway Bridges, Bridge A-Black Creek Trail and Bridge B-Biscayne Trail_02 20131220_103838 IMG_00000733 20131220_103934 Greenway Bridges IMG_00000665 IMG_00000666 IMG_00000670  Greenway Bridges, Bridge A-Black Creek Trail and Bridge B-Biscayne Trail_03