Naval Gateway Inn & Suites
NAS Key West, FL



Installation of Auger Cast Piles
  • # of Piles: 68 piles – 92 piles – 313 piles
  • Diameter: 16″
  • Length: 20′ – 22′ – 24′
  • Grout Strength: 5,000 PSI
  • Load Test: Compression and Tension
  • Additional Services: Sonotubes and Spoil Mixing

Images