Kirk Cottrell – Pavilion Improvements (Phase 2)

Kirk Cottrell – Pavilion Improvements (Phase 2)
Deerfield Beach , FL



Installation of Timber Piles
  • # of Piles: 30 piles
  • Diameter: 8″ x 8″
  • Length: 10′
  • Grout Strength: Not Applicable
  • Load Test: No Load Test
  • Additional Services: Not Applicable

Images